We have been instructed that we need to change the drainage design and instead of a charged system we now need to increase our water tanks to 10,000L and the overflow from this can be disposed to an absorption trench in the rear yard. The problem is the engineer has updated the design and placed another 2 massive water tanks down the other side of the house where we planned to have a clear pathway. I have had no luck contacting the engineer to try and either move the tank or change it dimension to be higher but a little thinner so we have more room down the side of the house.
To top it off our Contracts Co-ordinator resigned and had her last day is today. The role is officially vacant for a week and half. I don’t have too much hope of us getting back into council in the next few weeks.