Wednesday, December 22, 2010

All moved in now and we have a driveway

Within a few days of getting the keys we had the carpets installed and moved in not long after.
The big thing this week was getting the driveway installed.










Friday, December 3, 2010

We have the keys!!!

It has been an exciting 24 hours.
Last night we got a call from a neighbour asking if we were inside the house (we wern't) as they could see a flashlight shining around inside our house. We promptly called the cops and drove over. By the time we got there the cops had already been and had called us back. They checked through the house as it was open but thankfully didn't find anything missing or damaged. They locked it up on the way out.
However the good news is today we had handover and got the keys. We still have a few minor items to be fixed but overall it is great. A few pics below.

Feature wall in living area


Kitchen







Add Image



Monday, November 29, 2010

Blinds but still not keys

We had our blinds booked in for Thursday last week as we were expecting the keys by then. Our Site supervisor was happy to let us in to get them installed anyway. It appears only a little painting to go now so hopefully keys soon???

Downstairs dining area


Study with ceiling patched after leak

We can finally get a front on pic now the fence and site toilet is gone.


Living area.


Upstairs bedroom


Friday, November 12, 2010

Final inspection. Water leak

We had our final inspection today at 9AM. We found the gas hadn't been connected properly so we couldn't test the HWS or cooktops and found lots of little things that needed to be finished off or touched up with paint. The biggest problem was the water leak we found above the study. The ceiling was all mouldy and when poked with a stick water came pouring out onto the floor. The cause of the leak needs to be looked into and most of the ceiling needs to be replaced. Our site supervisor seems to think they will be able to fix the problems within a week so we can have the keys next Friday but I doubt it. We may have to wait another week.
A few pics from inspection below


Entry. Note: all the bits of blue sticky tape are areas to touched up.


Main Bathroom


View out to backyard. Garden is getting a little overgrown.


Ensuite

Thursday, November 4, 2010

Finally. We have a final inspection date

Friday the 12th Movember is our Final inspection date. We have hired a private building inspector to come through with us just in case we miss anything.
All going well we should have our keys the week after.
I'll post some pictures after the inspection next week.

Saturday, October 23, 2010

House almost done

We went past the house today and noticed the painters there finishing off the painting. We only have a few things left to be installed now and have been told we should be having our final inspection end of this week coming or the week after.


The council crossing has been installed by council but some locals have left their mark. P.S. I hope Dan and Alin break up real soon.


Saturday, October 16, 2010

Hot Water and Council Crossing



We drove past today and noticed the Hot Water System had been installed and the council had started digging out the old kerbing ready for the new. Surely we should be getting close to completion now??

Monday, October 4, 2010

Check measure and driveway quotes

We managed to organise with the site supervisor to let us in Thursday so both the blind and carpet companies could come to do the check-measure. The carpet guy actually turned up late but said he we would throw in free carpet to the garage steps to make up for it.

We also have had a few quotes for the driveway now. The last guy said we really should replace the gutter crossing as it currently is only 3m. He said it would look nicer and would be much easier to access our garage if we got council to replace this with a 4.5m one. I can imagine it will take council months before they get this done but it should be worth it.

Saturday, September 25, 2010

Water tanks and not much else

Another week gone and it looks like only one thing has happened. Hurry up builder.


We have 4 water tanks squeezed down the side of the property.


Oops. Looks like they forgot to hook this downpipe up.

Friday, September 17, 2010

Slowly progressing

We met with the site supervisor today and had a good look around. He said we are getting close to the end now. However there still seems to be so much left to do.

Tiling finished in kitchen and we have a range hood. The freestanding oven was sitting in the hallway ready to be installed.


We have some handrails. They have to come back as they missed doing the front patio.

Ensuite bathroom. Feature tile looks a little small on such a big wall.


Main bathroom almost sorted.

Saturday, August 28, 2010

Pergola, electrical, A/C and more landscaping

Hopefully not long to go now. We have been waiting for ages for the wrong bath that was installed to be replaced. That has held up tiling. Our site supervisor has been sick on and off for the last week or more, so haven't been able to get an update on what's happening.
We have lots of electrical points now hooked up all around the place.


Front garden bed and some of boundary retaining wall now put back in place.


More electrical and A/C ducts


We have a pergola. Brickwork around beams also completed.



We have an Air Conditioned. Bit of a squeeze.

Saturday, August 14, 2010

More tiling, landscaping and neighbour complaint

Retaining wall a little higher



Tiling rear alfresco. Pergola still to be installed.

Front tiling done.

Side retaining wall removed after excavation to allow room for side access. Neighbour not happy so we are are putting back some of the blocks for them.


Power pole.


Friday, August 6, 2010

Tiling and landscaping

Tiling started on living room floor


Tiling started on alfresco floor

Start of retaining wall. Noticed a broken drainage pipe running down the side cut. The landscapers are waiting on the builder to fix before they can backfill.


Path levelled down the low side. Doesn't look like much now but compared to the drop that was there a few days ago it looks amazing.


Saturday, July 31, 2010

More painting, staining and downpipes

Front columns and gable now painted. Site has been cleaned up too.


Downpipes now in. They will need to be painted soon


Front door stained

Thursday, July 22, 2010

Painting Started

We went for an inspection today with the supervisor and managed to take a few pics. The skylights have been installed, painting has started, site has been cleaned and levelled out. The wrong bath has been installed but we have been assurred the correct one has been ordered and will be fitted shortly. For some reason all the pics show random specs in them. I guess this is due to the flash reflecting light off the dust in the air?





Saturday, July 10, 2010

Locked Out

We have had some progess over the last 2 weeks. Scaffolding has come down. Roof tiles have gone up on the rear alfresco. Looks like they have finished the architraves and skirtings. Kitchen benchtop is on.



Pretty bad picture as taken from outside.