Saturday, January 30, 2010

Piering Done

Went past the block today and to our suprise they had finished the piering. A few small cracks in some of the concrete but I hear that is normal. Pics below
Front Left.
From the front

View from rear
Rear Alfresco

Split


Left hand side. 1M front and 1.5M rear side setback. Doesn't look like much room for a pathway at the front


1 comment: